A Simple Project Process Model for Estimating and Controlling Cost and Schedule.
- Author(s):
- Jones, H.
- Publication title:
- 36th International Conference on Environmental Systems : SAE technical paper
- Title of ser.:
- Society of Automotive Engineers technical paper series
- Ser. no.:
- 2006
- Pub. Year:
- 2006
- No.:
- 2006-01-2189
- Paper no.:
- 2006-01-2189
- Pages:
- 14
- Pub. info.:
- Warrendale, Penn.: Society of Automotive Engineers
- ISSN:
- 01487191
- Language:
- English
- Call no.:
- S10400
- Type:
- Technical Paper
Similar Items:
American Institute of Aeronautics and Astronautics |
7
Technical Paper
Projecting Future Scheduled Airline Demand, Schedules, and NGATS Benefits Using TSAM
American Institute of Aeronautics and Astronautics |
American Institute of Aeronautics and Astronautics |
National Aeronautics and Space Administration |
Society of Automotive Engineers |
American Society of Mechanical Engineers |
Society of Automotive Engineers |
10
Technical Paper
SOME NOTES OPTIMIZATION OF CONFIDENCE BANDS IN PROCESS CONTROL BASED ON APPROXIMATE MODELS
National Aeronautics and Space Administration |
5
Technical Paper
Methodology to Estimate System Schedule and Cost Risk Based on Historical Systems Data
American Institute of Aeronautics and Astronautics |
Society of Automotive Engineers |
6
Technical Paper
Control Systems Design for Linear Dynamic Systems Using Simple Models: Some Case Studies
National Aeronautics and Space Administration |
12
Technical Paper
Modeling and Sensing for Penetration Control of the SAW Process in the Presence of Welding Perturbations.
American Society of Mechanical Engineers |